How Maersk executed a coordinated logistics plan to ensure timely delivery of raw material goods to a manufacturing unit in a remote corner of Nigeria.

An illustration of a PET resin plant in Nigeria which produces 150,000 tons per annum.

The customer

Engee PET Manufacturing Company Nigeria is a leading manufacturer of high-quality food-grade PET resin in West Africa. The company’s factory, located at lgbesa in Nigeria’s Ogun State, was commissioned in 2017 as part of a backward area development programme. The plant has a production capacity of around 150,000 tons per annum.

An illustration depicting Maersk customs clearance and inland trucking for cargo that’s arrived in Nigeria from China.

The requirement

In 2021, the company needed to transport resin products of nearly 250 twenty-foot equivalents (TEUs) from Jiaxing, China, to its factory in Igbesa, Nigeria.

Once the cargo arrives at the Apapa port in Nigeria, it is imperative that customs clearance and inland trucking to the factory are swift. Any hold-ups would lead to delays in production and a consequent loss of business to the competition. In an intensely competitive market, any fall in market share would be difficult to regain.

An illustration of the resin products’ journey from China to Nigeria with Maersk transportation services.
PET resin warehouse in Nigeria.

The challenge

Engee had initially engaged a third-party agent to process their customs applications. However, the agent was unfamiliar with the documentation involved for fast-track licences, and this led to delays and increased overheads. Moreover, the company faced considerable difficulty in retrieving money deposited with the agent as a security fee.

Another challenge the company faced was the transport of cargo within Nigeria. The goods were trucked from the Apapa port to a boat jetty, where barges would move the cargo across the River Ore to a dock on its banks. From there, trucks would transport the cargo to the destination, the factory in Igbesa.

To ensure an uninterrupted journey, the customer would need a partner adept at handling multi-modal logistics. A single capable partner with the right solutions could coordinate better and ensure timely deliveries.

Engee also needed a partner who could provide transit insurance since the roads leading to the factory were in bad shape, increasing the risk of damage to goods. The safety of the goods was of prime importance.

An illustration of the Maersk’s local team that assists in customs clearance, cargo tracking and transportation.

The solution

When contacted, our local team quickly drew up a list of pain points.
These included:

  • Lack of visibility on the location and status of cargo
  • Extra costs arising from demurrage and detention at the port
  • The possibility of a plant shutdown due to shipment delays

Once the challenges were identified, we proposed a solution to handle all transport requirements from start to finish.

To address the lack of visibility, the Maersk team provided regular updates to the customer on the location of the cargo. The team also acted as a single point of contact for any support the customer required.

Our team of in-house experts handled the customs documentation. The submission was done on the Nigeria customs portal, and the entire process was completed without any hitches or delays.

After customs clearance, the shipment was taken to an Integrated Container Depot (ICD). Storage of the cargo here, instead of at the port, helped avoid detention and demurrage charges. Maersk was also able to leverage its relationship with the ICD to get the customer a waiver on storage charges.

For the transport requirement, which was more complex, the local team designed a tailor-made solution.

  • We deployed multiple barges to circumvent the traditional land route that was congested and dotted with potholes.
  • We moved 10-12 containerised trucks a day from the jetty to the warehouse at Igbesa.
An illustration of Maersk inland transport and customs services that ensured resin products’ delivery in 14 days.

The results

Both customs clearance and inland transport were achieved in 14 days — 50% faster than the normal delivery timelines of 25 to 35 days. Our strategy of bundling customs services with inland transport solutions ensured the cargo moved seamlessly and reached its destination ahead of time.

Meticulous coordination between the execution, vendor management and leadership teams helped achieve the requirements of the customer, who was happy with the speed and care with which the operation was carried out.

Next steps

Impressed with the success of the collaboration with Maersk, Engee has awarded us business of approximately 130 TEUs. We look forward to a long and fruitful partnership with Engee.

Anything you need, we’re here to help

솔루션

솔루션

공급망의 시작부터 끝까지 고객의 요구를 충족하기 위해 최선을 다합니다.
문의하기

문의하기

전문가로 이루어진 전담팀이 고객분들을 위해 대기하고 있습니다.
운임 찾기

화물을 운송할 준비가 되셨나요?

새로운 해상 운송 및 내륙 운송 요율을 찾습니다.
소식 받기
뉴스와 인사이트 구독
최신 공급망 트렌드를 이메일로 받아보세요

이 양식을 제출하면 A. P. Moller-Maersk 및 그 계열사로부터 이메일을 통해 물류 관련 뉴스 및 마케팅 소식을 수신하는 데 동의합니다 . 본인은 구독 취소 링크를 클릭하면 언제든지 Maersk 마케팅을 수신 거부할 수 있습니다. 개인 정보를 처리하는 방법에 대한 자세한 내용은 개인정보 고지를 참조하세요.

등록해 주셔서 감사합니다
뉴스레터를 구독하셨습니다. 뉴스레터 기본 설정 방법이 담긴 이메일을 곧 보내드립니다.
구독 중
언제든지 구독을 취소할 수 있습니다.