Shipping to and from U.A.E.
Your complete guide to shipping to and from U.A.E. Find the right route, get Maersk office locations, discover local solutions, payment options and more.
Export
Get up-to-date local information about export procedures and restrictions, demurrage and detention, container pick-ups and more.
Combined Demurrage and Detention
Combined demurrage and detention starts from gate-out empty day (included) from terminal, ends with shipped on board date (included).
Currency - AED
Free time
| TYPE | DRY | FLAT & OPEN TOP | REEFER | IMO |
|---|---|---|---|---|
|
TYPE
DAYS
|
DRY
10
|
FLAT & OPEN TOP
5
|
REEFER
5
|
IMO
5
|
Tariff after free time
| Days after freetime expiration | 20' DRY/NOR | 40'/45' DRY/HC/NOR |
|---|---|---|
|
Days after freetime expiration
Day 11– 14
|
20' DRY/NOR
85
|
40'/45' DRY/HC/NOR
170
|
|
Days after freetime expiration
Day 15 - 21
|
20' DRY/NOR
170
|
40'/45' DRY/HC/NOR
340
|
|
Days after freetime expiration
Day 22 Onwards
|
20' DRY/NOR
340
|
40'/45' DRY/HC/NOR
680
|
| Days after freetime expiration | 20' REEF | 40' REEF | 20'FLAT / OPEN TOP | 40'FLAT / OPEN TOP | 20'IMO / 40'IMO |
|---|---|---|---|---|---|
|
Days after freetime expiration
Day 6 - 10
|
20' REEF
250
|
40' REEF
500
|
20'FLAT / OPEN TOP
85
|
40'FLAT / OPEN TOP
170
|
20'IMO / 40'IMO
85 / 170
|
|
Days after freetime expiration
Day 11 – 15
|
20' REEF
500
|
40' REEF
1000
|
20'FLAT / OPEN TOP
170
|
40'FLAT / OPEN TOP
340
|
20'IMO / 40'IMO
170 / 340
|
|
Days after freetime expiration
Day 16 Onwards
|
20' REEF
1000
|
40' REEF
2000
|
20'FLAT / OPEN TOP
340
|
40'FLAT / OPEN TOP
680
|
20'IMO / 40'IMO
340 / 680
|
Storage
Mention triggers for calculation as per standard triggers
All U.A.E Ports excluding Sharjah , Fujairah
Free time
| TYPE | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20' ALL TYPES
10
|
40' ALL TYPES
10
|
20'OOG
10
|
40'OOG
10
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
Days after freetime expiration
Day 11 - 30
|
20' ALL TYPES
31
|
40' ALL TYPES
62
|
20'OOG
93
|
40'OOG
186
|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
41
|
40' ALL TYPES
82
|
20'OOG
123
|
40'OOG
246
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
82
|
40' ALL TYPES
164
|
20'OOG
246
|
40'OOG
492
|
Fujairah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES |
|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
1
|
40'ALL TYPES
1
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 2 - 11
|
20' ALL TYPES
60
|
40' ALL TYPES
100
|
|
Days after freetime expiration
Day 12- 21
|
20' ALL TYPES
90
|
40' ALL TYPES
175
|
|
Days after freetime expiration
Day 22 onwards
|
20' ALL TYPES
175
|
40' ALL TYPES
350
|
Sharjah PORT - Free time:
| TYPE | 20'ALL TYPES | 40'ALL TYPES | 20'OOG | 40'OOG |
|---|---|---|---|---|
|
TYPE
Days
|
20'ALL TYPES
30
|
40'ALL TYPES
30
|
20'OOG
NIL
|
40'OOG
NIL
|
Tariff after free time
| Days after freetime expiration | 20' ALL TYPES | 40' ALL TYPES |
|---|---|---|
|
Days after freetime expiration
Day 31 - 60
|
20' ALL TYPES
75
|
40' ALL TYPES
150
|
|
Days after freetime expiration
Day 61 onwards
|
20' ALL TYPES
150
|
40' ALL TYPES
300
|
Tariff after free time
| Days afterfreetimeexpiration | 20'OOG | 40'OOG |
|---|---|---|
|
Days afterfreetimeexpiration
Day 1 - 10
|
20'OOG
60
|
40'OOG
120
|
|
Days afterfreetimeexpiration
Day 11 - 30
|
20'OOG
90
|
40'OOG
180
|
|
Days afterfreetimeexpiration
Day 31 - 60
|
20'OOG
160
|
40'OOG
320
|
|
Days afterfreetimeexpiration
Day 61 onwards
|
20'OOG
200
|
40'OOG
400
|
UAE ports Cut off Details - WK 35-36 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI Cut off | 3rd Party SOC loadlist submission deadline | VGM & ED/Gate in Cut off (Tentative) / Please refer Dubai trade |
|---|---|---|---|---|---|---|---|---|
| Jebel Ali T2 | TB LINHAI | 0014 | Thu 27 19:00 | Fri 28 10:00 | Tue 25 11:00 | Tue 25 17:00 | Mon 24 22:00 | Thu 27 07:00 |
| Jebel Ali T2 | SOURCE BLESSING | 635W | Fri 28 07:00 | Sat 29 01:00 | Wed 26 11:00 | Wed 26 17:00 | Tue 25 22:00 | Thu 27 19:00 |
| Abu Dhabi Port | SOURCE BLESSING | 636E | Sun 30 09:00 | Mon 31 09:00 | Fri 28 11:00 | Fri 28 17:00 | Fri 28 09:00 | Sat 29 21:00 |
| Jebel Ali T2 | MAERSK YORKTOWN | 635N | Thu 03 19:00 | Fri 04 10:30 | Mon 31 08:00 | Mon 31 14:00 | Sun 30 15:00 | Thu 03 07:00 |
| Jebel Ali T2 | CONSTANTINOS P II | 633S | Sat 05 05:00 | Sat 05 20:00 | Thu 03 11:00 | Thu 03 17:00 | Wed 02 18:00 | Fri 04 17:00 |
| Sharjah | MAERSK YORKTOWN | 635N | Fri 04 19:00 | Mon 07 02:30 | Wed 02 11:00 | Wed 02 17:00 | Tue 01 19:00 | Fri 04 07:00 |
| Sharjah | SOURCE BLESSING | 636E | Sat 05 09:00 | Tue 08 09:00 | Thu 03 11:00 | Thu 03 17:00 | Thu 03 09:00 | Fri 04 21:00 |
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Khor Fakkan | MAERSK GAIRLOCH | 628S | Sun 30 00:12 | Tue 01 12:12 | Sun 23 09:00 | Sun 23 14:00 | Mon 24 10:00 | Tue 25 00:12 |
| Khor Fakkan | MAERSK BALTIMORE | 637S | Fri 04 10:00 | Sun 06 22:00 | Fri 28 09:00 | Fri 28 14:00 | Sat 29 10:00 | Sun 30 10:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 629S | Tue 08 19:12 | Fri 11 07:12 | Tue 01 09:00 | Tue 01 14:00 | Wed 02 10:00 | Thu 03 19:12 |
| Khor Fakkan | TAURANGA MAERSK | 636E | Thu 10 01:00 | Fri 11 21:01 | Thu 03 09:00 | Thu 03 14:00 | Fri 04 10:00 | Sat 05 01:00 |
| Khor Fakkan | MAERSK BALTIMORE | 639S | Sun 13 19:00 | Wed 16 07:00 | Sun 06 09:00 | Sun 06 14:00 | Mon 07 10:00 | Tue 08 19:00 |
| Khor Fakkan | MAERSK GAIRLOCH | 630S | Fri 18 19:12 | Mon 21 07:12 | Fri 11 09:00 | Fri 11 14:00 | Sat 12 10:00 | Sun 13 19:12 |
| Khor Fakkan | MAERSK BALTIMORE | 641S | Wed 23 19:00 | Sat 26 07:00 | Wed 16 09:00 | Wed 16 14:00 | Thu 17 10:00 | Fri 18 19:00 |
Fujairah terminal Cut off Details - WK 35-36 2026
| Port | Vessel Name | Voyage | ETA | ETD | Booking Cut off | Load list / SI/ VGM Cut off | ED Document to be share with Maersk | Jebel Ali Gate in / Inspection |
|---|---|---|---|---|---|---|---|---|
| Fujairah Terminal | SAFEEN POWER | 634S | Mon 31 15:50 | Wed 02 22:50 | Mon 24 09:00 | Mon 24 14:00 | Tue 25 10:00 | Wed 26 15:50 |
| Fujairah Terminal | GFS PRIDE | 047N | Tue 01 23:00 | Wed 02 23:00 | Tue 25 09:00 | Tue 25 14:00 | Wed 26 10:00 | Thu 27 23:00 |
| Fujairah Terminal | GSL ROSSI | 636S | Tue 01 11:00 | Thu 03 18:00 | Tue 25 09:00 | Tue 25 14:00 | Wed 26 10:00 | Thu 27 11:00 |
| Fujairah Terminal | GFS PRIDE | 049N | Sun 06 04:00 | Mon 07 04:00 | Sun 30 09:00 | Fri 28 14:00 | Mon 31 10:00 | Tue 01 04:00 |
| Fujairah Terminal | GFS PRIDE | 051N | Wed 09 11:00 | Thu 10 11:00 | Wed 02 09:00 | Wed 02 14:00 | Thu 03 10:00 | Fri 04 11:00 |
| Fujairah Terminal | GFS GISELLE | 042E | Thu 10 20:00 | Fri 11 18:00 | Thu 03 09:00 | Thu 03 14:00 | Fri 04 10:00 | Fri 04 20:00 |
| Fujairah Terminal | SAFEEN POWER | 636S | Fri 11 04:00 | Sun 13 11:00 | Fri 04 09:00 | Fri 04 14:00 | Fri 04 10:00 | Fri 04 04:00 |
| Fujairah Terminal | GFS PRIDE | 053N | Sun 13 11:00 | Mon 14 11:00 | Fri 04 09:00 | Fri 04 14:00 | Mon 07 10:00 | Tue 08 11:00 |
| Fujairah Terminal | GFS GENESIS | 016E | Sun 13 08:00 | Tue 15 08:00 | Fri 04 09:00 | Fri 04 14:00 | Mon 07 10:00 | Tue 08 08:00 |
| Fujairah Terminal | GSL ROSSI | 638S | Wed 16 04:00 | Fri 18 11:00 | Wed 09 09:00 | Wed 09 14:00 | Thu 10 10:00 | Fri 11 04:00 |
| Fujairah Terminal | MDV AEFJR DUMMY 1 | 001W | Sun 20 19:30 | Tue 22 09:30 | Fri 11 09:00 | Fri 11 14:00 | Mon 14 10:00 | Tue 15 19:30 |
| Fujairah Terminal | GFS PRIDE | 055N | Sun 20 11:00 | Wed 23 11:00 | Fri 11 09:00 | Fri 11 14:00 | Mon 14 10:00 | Tue 15 11:00 |
| Fujairah Terminal | SAFEEN POWER | 638S | Wed 23 19:00 | Sat 26 02:00 | Wed 16 09:00 | Wed 16 14:00 | Thu 17 10:00 | Fri 18 19:00 |
If the actual commodity is Steel Coil or Metal Material Article with weight of per unit more than 2 tons then you must have to follow a Process of standard stuffing to avoid cargo shift during transport.
If single Commodity weight is more than 2 ton or Commodities in bundles or multiple commodities put on pallet then Single pallet weight is more than 2 ton, we require stuffing images in word file format for each container separately.
If your actual Commodity is METAL COIL / Similar = Please refer attached TT Club guidelines + COIL REQUEST TEMPLATE version 1.16
If your actual Commodity is Metal Plates / Similar = Please refer attached Plates A REQUEST TEMPLATE version 1.4
If your actual Commodity is Metal Pipes/Rod / Similar = PIPE D Heavy Bars REQUEST TEMPLATE version 1.3
Please do not gate-in Containers until Stuffing wise acceptance is received from our side.
Important note: Unless the pictures of stuffing and securing are sent and stuffing acceptance confirmation received from our end, kindly do not seal the box or move them to gate in. Improper lashing / securing can be unseaworthy and pose threat to life and can damage crane/vehicle/cargo/container and/or vessel.
Export:
Export Class 5 IMDG Containers shall be shipped from Port within 3 Days.
Transshipment:
Transshipment Class 5 IMDG Containers shall not be stored in Port more than 7 Days.